TC Engineering AS has made a number of specialised systems for increased efficiency and simplified operation during maintenance, demolishing and rebuilding of flue walls.
|
DEMOLITION OF FLUE WALLS
TC has solutions for demolition of flue walls by grabbing. The grab will take section with a length up to 3 m and a height up to 1.5 m. The capacity will be up to 10 tons. A knife/ peak system will secure grip at the wall side during grabbing. |
|
REBUILDING OF FLUE WALLS
In order to reduce time and man hour at site during rebuilding of flue walls TC has systems for handling of wall sections or complete walls. The walls may then be prebuilt and handled as complete unit into the backing area.
TC has different solutions for different wall designs. For some wall designs special starter blocks will have to be used while other designs may be handled directly.
|